Forged Metal Iron Core for Rubber Track/Crawler

Product Details
Customization: Available
Processing Object: Metal
Molding Style: Forging
Still deciding? Get samples of US$ 1/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (26)
  • Forged Metal Iron Core for Rubber Track/Crawler
  • Forged Metal Iron Core for Rubber Track/Crawler
  • Forged Metal Iron Core for Rubber Track/Crawler
  • Forged Metal Iron Core for Rubber Track/Crawler
  • Forged Metal Iron Core for Rubber Track/Crawler
  • Forged Metal Iron Core for Rubber Track/Crawler
Find Similar Products

Basic Info.

Model NO.
as per your request
Molding Technics
Die Forging
Application
Machinery Parts
Material
Steel
Heat Treatment
Quenching and Tempering
Surface Treatment
Sand Blasting
Forging Tolerance
+/-0.5mm
Standard
Per Your Request
Certification
RoHS, ISO 9001:2000, ISO 9001:2008
Transport Package
Wooden Case
Specification
ISO9001: 2008; SGS; ISO/TS16949
Trademark
LIANGGONG
Origin
China
HS Code
7326191000
Production Capacity
20000 Ton/Year

Product Description

Product Description

We can manufacture a wide variety of metal cores for rubber track,and metal cores are essential spare parts in rubber track production.Now our metal core have been sold to many countries such as Thailand,Japan,USA and have been warmly welcomed by them,below is our products information:

1,Main Material: carbons steel 45# and alloy steel 40Cr or some other materials which customer requested.

2,Heat Treatment:HRC42-46 or some other hardness which customer requested.

3,Surface treatment:Shot Blasting.

4,Producttion Equipment:300Ton,400Ton,630Ton,1000Ton,1600Ton,2500Ton Press.

5,Product Weight:0.1kg-20kg

6,Models: From LG100*72 to LG 800*150



FAQ:  

1. Are you a genuine manufacturer?Yes, all products showed in our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import.  

2. I want to keep our design in confidence; can we sign NDA?Sure, to protect customers' profit is our obligatory responsibility, signed NDA would be valid to both of us.. 

3. What should I offer to get your quotation?Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, package. Any special requirements should be highlighted especially for tolerance.  

4.How long does it take to receive samples?
20 working days,the lead time is the general production period and does not include the transportation time.
we can supply free samples with less quantity,but customers need to pay shipping cost.

5.How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.The lead time is the general production period without the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

6.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Ningbo Port.

7.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

8.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 30% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

9.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mould, fixture and gauge and making them in our factory---mould.fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delievry


10.Which countries do you export to?
Now mainly export to U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand and so on.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How to handle the complains?
--If happen any complaints after delivery,please just show us photos and detail compliants points, we will check with the production department and QC department Immediately and give you best solving solution which agreed by both of us,moreover we will bear all the cost (including shipping cost).


Forged Metal Iron Core for Rubber Track/Crawler

Forged Metal Iron Core for Rubber Track/Crawler
 
 
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/Crawler

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier